105316/HYB/21 | Hybrid application comprising: (a) Full application for the creation of a green hydrogen production facility (10MW capacity, circa 4 tonnes of hydrogen production per day), including battery storage, compressors, hydrogen storage and tanker loading facilities. (b) Outline application for expanded green hydrogen production facility within wider site (200MW capacity, up to 50 tonnes of hydrogen storage). | Power Station 132 Manchester Road Carrington M31 4AY
113522/HAZ/24 | Application for Hazardous Substances Consent for the storage and involvement in industrial processes of 7,500 tonnes (maximum) of Molten Salt, 276 tonnes (maximum) of Potassium Nitrate - Crystalline form, 208 tonnes (maximum) of Sodium Nitrite - Crystalline form and 37 tonnes (maximum) of Sodium Nitrate - Crystalline form on site, falling into Part 1, 2 or 3 of Schedule 1 to the Planning (Hazardous Substances) Regulations 2015. | Land Adjacent To Carrington Power Station Manchester Road Carrington Manchester M31 4AY
110808/EIASCR/23 | Request for a screening opinion in respect of a new hydrogen pipeline to connect in to the Trafford Green Hydrogen Project | Power Station 132 Manchester Road Carrington M31 4AY
CPC comments: No objection
Presentation prepared for Parish council meeting on 23th August 2021
Parish Council Representation on the planning application